0456 030 378|[email protected]|Based in Fawkner · Northern Melbourne
Request a Quote

Fawkner · Northern Melbourne

Appliance installation in Fawkner

From brick homes near Bonwick Street to newer dwellings off Major Road, Fawkner laundries and kitchens come in all shapes. We install washing machines, dishwashers and freestanding ovens, hooking them up to the taps, drain and power point that are already there, and we do it from our own base in Fawkner.

Request a Quote
Worker holding a wrench beside a washing machine and laundry connections

Let us call you

Leave your details and we will call you back.

Washing machines in Fawkner laundries

A standard washing machine fitting starts with unpacking the machine and pulling out the transit bolts that hold the drum still in transit. We then level the feet so it will not walk on the spin cycle, connect the inlet hoses to your existing taps, hook the drain hose securely into the trough or standpipe, plug it in and run a cycle to check for leaks. A normal fitting takes no more than 60 minutes.

In Victoria, connecting appliance hoses to taps that are already there is not plumbing work under regulation 12(2)(e) of the Plumbing Regulations 2018. A new tap, a tap that needs moving or a drain that needs changing is different: that work belongs to a licensed plumber, and we will flag it before you book.

Dishwashers and ovens in the kitchen

Replacing a dishwasher is usually a like-for-like swap: isolate the tap, disconnect the old unit, slide it out, fit the new one into the same cavity, secure it with its brackets and test it. Putting a dishwasher in for the first time needs a cavity, a dishwasher tap, a drain connection and a power point already in place.

We also install freestanding plug-in ovens and cooking ranges, and fit built-in ovens once an electrician has connected them. Hardwired ovens and cooktops need a licensed electrician and gas appliance work needs a licensed gasfitter. Tradie at Door does not do licensed electrical or gas work.

Out with the old one

We disconnect the appliance being replaced and move it clear so the new one can go straight in. If you want the old unit taken away, disposal or recycling is a separate charge, and it is listed in your quote so there are no surprises.

Short on laundry floor space? Stacking a dryer on a front-loader is available, subject to the two machines being compatible, the manufacturer’s stacking kit being on hand and the floor being level and solid.

What to send with your request

A few photos let our team confirm the job without a separate inspection. Tell us where the delivered appliance will be waiting and whether steps, narrow doorways or other obstacles affect the route into the laundry:

Moving in with more than appliances? List any new storage or furniture to assemble separately, with the model or instruction cover for each kit.

  • The make and model of the new appliance
  • The space it is going into, with the taps and power point visible
  • The trough, standpipe or drain point
  • For a dishwasher, the cavity width and the kickboard

FAQs

Is my Fawkner laundry ready for a new washing machine?

If it has existing washing machine taps, a trough or standpipe for the drain hose and a power point the cord can reach, it usually is. Send a photo and our team will confirm.

Can you connect a gas cooktop?

No. Gas appliance work must be done by a licensed gasfitter in Victoria. We can position and fit a freestanding plug-in oven or cooking range.

Which brands do you install?

All major brands, following the manufacturer’s instructions. Tradie at Door is not affiliated with or endorsed by any appliance brand.

How long will the washing machine take?

A normal fitting takes no more than 60 minutes. Removing the old machine or stacking a dryer adds time.

Request a callback

Use the form at the top of this page and our team will call you back about appliance installation in Fawkner. Prefer to send photos and a longer description? Request a detailed quote.

Request a callback